New to Jbase with a background in ADP's Reality. The problem I am having is that items within a COMMON area are not transferring to subroutine. The original system was as follows:
program A - $include commons os.inv ( this program sets many variables set within the include )
--calls program B - carries the same include of os.inv, it does reference a common variable, but otherwise does not set any
----calls program C - carries the include, references a common variable
I have basically created the following:
program A
--program B
----program D - new program, has the same include, but the common variables are not assigned??
------program C
no idea why program D, despite being a subroutine and having the same include, has unassigned common variables
Also, was curious if there was a way to view a program which included the code from the includes. In ADP's reality, they had a command called BLIST with the option of (MEL that would give you a listing of the entire program, with included code, and formatted with proper indentions. It was very handy. Is there a similar way to do this in Jbase?
Thanks for any help.
------------------------------
Chris Razzano
Senior PICK programmer
Rocket Forum Shared Account
------------------------------