Hello.
I have a customer that we are migrating to iCluster from iTera. We have access to their source system and have created a new source (To be source) system and target (to be target) on our servers.
We were planning to migrate them by pointing the current source system to our two systems. Theirs will be called system A, our to be source is B, and our to be target is C.
Original thought was to Point A to both B and C. Then we would roleswap or shutdown A, and then modify B to point to C and be done. But while setting up the groups, this did not seem to be the way to go. Using *HADR did not seem like it would work (the only way I saw to point to two different systems).
We opened a ticket with support, and they suggested A to B, and B to C. But that also brings up questions about how to do the switchover and get B to be the new primary and leaving out A.
Currently we do not have access to the iTera target, so we cannot use the preferred method of Old Source to new source, old target to new target method, which also brings about questions on how to switchover and point new source to new target.
Any help is appreciated.
Question
Migrating to new Source and Target from current source
Sign up
Already have an account? Login
Welcome to the Rocket Forum!
Please log in or register:
Employee Login | Registration Member Login | RegistrationEnter your E-mail address. We'll send you an e-mail with instructions to reset your password.
