Problem:
How to convert Elink repository from a ELMasterRepository to an ELRepository?
Resolution:
When converting from an ELMasterRepository to a ELRepository a few manual steps are required to remove the project management settings and prepare the database for shared, uncontrolled use.
Remove the Project Management tables and stored procedures
Open the http://localhost/stdocs -> Project Manager
Click on the i information help icon
On the window that appears, scroll down and click on the EnterpriseLink Project Manager Administrators Guide
Scroll down and click on Remove Project Manager under the appropriate database type
Reset the Check-in/Check-out settings on the pages
Open up http://localhost/stadmin/query.html
Set the Server to ELMasterRepository
Clear the User and Password field if operating under a trusted connection or supply a database administrator or password field
In the Query field enter the following and click OK:
UPDATE SR_MPAG SET buttonbar = CASE
WHEN buttonbar = 0 THEN 0
WHEN buttonbar = 1 THEN 1
WHEN buttonbar = 2 THEN 0
WHEN buttonbar = 3 THEN 1
WHEN buttonbar = 16 THEN 16
WHEN buttonbar = 17 THEN 17
WHEN buttonbar = 18 THEN 16
WHEN buttonbar = 19 THEN 17
END
The ELMasterRepository Data Source Name can be renamed to ELRepository on each authoring station using the http://localhost/stadmin/ - > Configuration - > Repository page. If the project(s) in this repository need to be moved to another instance of this or other DBMS, use the standard migrate web form or migrate command line utility.
#EnterpriseLink
#Rumba