My company go over from Windows Server 2008 to Windows Server 2012.
Now I work with Net Express 5.1.
I have some questions :
- Is it possible to covert to Visual COBOL for Eclipse on a Windows server 2008 ?
- Are there "surprises" to be expected when converting to Visual Cobol take place ?
- Is it possible to use/run Net Express 5.1 Runtime at the same time with Visual COBOL runtime in Acceptance test and Production




