I'm running Visual Studio 2019 with VC 5 PE. The license on VC 5 has just expired.
Do I have to re-license VC 5 PE or wait until VC 6 PE is available? When will VC 6 PE be available?
Thanks
I'm running Visual Studio 2019 with VC 5 PE. The license on VC 5 has just expired.
Do I have to re-license VC 5 PE or wait until VC 6 PE is available? When will VC 6 PE be available?
Thanks
I'm running Visual Studio 2019 with VC 5 PE. The license on VC 5 has just expired.
Do I have to re-license VC 5 PE or wait until VC 6 PE is available? When will VC 6 PE be available?
Thanks
Visual COBOL 6.0 PE is now available for download from here:
The licensing is done differently in the 6.0 PE. When you receive the email from which you can download the product you will be provided with a 16 digit product authorization key.
Save this 16 digit key and enter it in the licensing dialog when you start the Visual Studio IDE.
Visual COBOL 6.0 PE is now available for download from here:
The licensing is done differently in the 6.0 PE. When you receive the email from which you can download the product you will be provided with a 16 digit product authorization key.
Save this 16 digit key and enter it in the licensing dialog when you start the Visual Studio IDE.
Thanks Chris.
Already have an account? Login
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.